We recently carried out an install for Eurotunnel based at the cash office for the main terminal passenger building. The work undertook was carried out over a two day period installing a Daikin High Wall Split System.

The initial pipe run was a complicated install due to the fact it is a highly visible area of the building with several level changes and angles to compete with.

We installed white trunking to hide the piping to work seamlessly with the decor.This was run next to a spiral staircase at eye level so we had to ensure the job was completed to the highest standard due to the visibility of the work.